# Acceptance testing

Acceptance testing checks whether delivered capacity meets the conditions the parties agreed for contractual sign-off.

## What the test establishes

An agreed plan defines the inventory, configuration, workload, thresholds, and evidence required for delivery. A GPU cluster may need device diagnostics, fabric and storage tests, and a controlled checkpoint restore. [Cluster burn-in](https://computeneutral.com/guides/gpu-cluster-acceptance-testing) exercises the system under sustained load and can be one component of acceptance. Test the node grouping and software configuration covered by the order.

![A single liquid-cooled rack of compute trays around a central band of switch trays, with a coolant distribution unit beside it.](https://computeneutral.com/assets/editorial/checkpointing-plate.svg)

Illustrative. A buyer receives eight nodes. The device diagnostics pass. The assigned group falls below the cross-node bandwidth floor. The parties record the variance and follow the agreed repair and retest process before the buyer signs off on that group.

## Where it appears

The acceptance procedure usually sits in the order, technical schedule, or statement of work. The [buyer signing checklist](https://computeneutral.com/guides/questions-before-signing-a-compute-contract) connects those documents to billing and notice deadlines. Read the acceptance clause with the service-level agreement, which can separately govern availability and remedies during ongoing service.

## Sources

- [NVIDIA DCGM diagnostic plugin reference](https://docs.nvidia.com/datacenter/dcgm/latest/reference/diagnostics/plugins/index.html), reviewed November 19, 2026. GPU, memory, interconnect, and sustained-load checks.

Last updated on November 20, 2026

## Have a financing question?

Bring the capacity, delivery window, and financing question. Start with the cash required to deliver and the conditions that start customer payments.

Email [hello@computeneutral.com](mailto:hello@computeneutral.com) or [book a call with our team](https://calendar.computeneutral.com/book/neutral-sales).

[Discuss a financing](mailto:hello@computeneutral.com?subject=Neutral%20%7C%20Acceptance%20testing)